  • 1.  Intermediate Casing Integrity Vs. Well Integrity

    Posted 06-04-2013 03:58 AM
    This message has been cross posted to the following Discussions: Well Integrity and Drilling .
    -------------------------------------------

    Dear professionals,

    I have an intermediate 13 3/8 in casing which failed 200 psi pressure test & returned water (test media) from the conductor pipe indicating shallow failure; i.e. 13 3/8 in casing has lost its containment. The 13 3/8 in casing is cemented to surface inside a conductor pipe however, cement level between the 9 5/8 in x 13 3/8 in casing is below surface.
    The well has no what so ever other -known- leaks elsewhere, i.e. completion and production casing are integral thus, the two barriers requirement is met!
    On the failure matrix we have a casing leak and on the risk register Annulus B has lost its containment, but -again- I have two independent mechanical & tested barriers in place for the leak path inside the production casing. From behind the 9 5/8 in casing cement logs showed good cement above the reservoir as well as above the DV Stage Tool (inside the 13 3/8 in casing).

    I need your help to assess this well from well integrity & structural integrity viewpoints & to kindly help me identify hidden possible threats. Well type: Oil Producers or Water Injectors.
    Environment is offshore.

    The questions I have and would appreciate your questions/discussion too are as following:
    1- How would you -roughly- risk rank and/or risk assess such failure?
    2- Is the failure in the 13 3/8 in casing considered as a failure in the well integrity envelop or a threat to the well structure, or both?
    3- Can you please help me think of any potential failure scenarios?
    4- Without knowing much about the 13 3/8 in casing integrity (remnant wall thickness, corrosion rate, nature of failure etc.) how can we assess its impact on the overall well structure & load bearing capability? Any assessment techniques in the market?
    5- Can you suggest any mitigations/cure options? To me a 7 in tie back doesn't add much to the existing barriers nor addresses possible future leak behind casing which may be caused by cement failure? It may be for structural support only!
    6- Anything else?

    Sincere regards,

    -------------------------------------------
    Obadah Al Sawadi
    Well Integrity Engineer
    -------------------------------------------



  • 2.  RE:Intermediate Casing Integrity Vs. Well Integrity

    Posted 06-05-2013 03:06 AM
    Dear Obadah Al-Sawadi

    I want further information about the pressure in the conductor casing valve before the pressure test and the presence of any hydrocarbon in the annular space. It will provide the insight about the leak.

    Regards


    -------------------------------------------
    Ranjeet Anand
    Engineer
    Oil & Natural Gas Corp. Ltd.
    Navi MumbaiMH
    -------------------------------------------








  • 3.  RE:Intermediate Casing Integrity Vs. Well Integrity

    Posted 06-05-2013 05:07 AM
    Thank you Ranjeet for your response,

    There is no pressure in Annulus A (contained by 9 5/8" production casing), Annulus B has lost its containment however no effluent return exists and the conductor pipe is an open-top casing, i.e. not a containment by design.

    Best regards

    -------------------------------------------
    Obadah Al-Sawadi
    Well Integrity Engineer
    -------------------------------------------








  • 4.  RE:Intermediate Casing Integrity Vs. Well Integrity

    Posted 06-06-2013 12:24 AM
    Dear Obadah Al-Sawadi

    On examination of the reply given by you that there is no pressure buildup and there is no hydrocarbon presence shows that outer casings are not connected to the hydrocarbon formation. Therefore, this case can be ignored and no action is required. 

    The chance of corrosion is also bleak since there is no oxygen present but still if you feel like to pursue it, I will advise you to pump some corrosion inhibitor to avoid corrosion due to water.

    Regards

    -------------------------------------------
    Ranjeet Anand
    Engineer
    Oil & Natural Gas Corp. Ltd.
    Navi MumbaiMH
    -------------------------------------------








  • 5.  RE:Intermediate Casing Integrity Vs. Well Integrity

    Posted 06-07-2013 03:13 AM
    Obada,
    Nice to hear from you. The a very interetsting case you have on your hands, it does not seem to have a straight forward solution
    is it possible to send the well schematic with more information so I can visulise better the well and assess the situation?

    -------------------------------------------
    Salim Taoutaou
    Well Integrity Domain Manager South East Asia
    Schlumberger
    Kuala Lumpur
    -------------------------------------------








  • 6.  RE:Intermediate Casing Integrity Vs. Well Integrity

    Posted 06-05-2013 05:00 AM
    Dear peers,

    Although I prefer to hear from you on SPE Connect; however I understand the difficulty of providing specific or certain Well Integrity assessment or recommendations in public. For those who would like to communicate in private pertaining this topic, please email me at alsawady@zadco.ae.

    Best regards,

    -------------------------------------------
    Obadah Al-Sawadi
    Well Integrity Engineer
    -------------------------------------------