Well Integrity Technical Section

 View Only
  • 1.  Gas lift design

    Posted 06-12-2015 01:24 PM
    This message has been cross posted to the following Discussions: Production and Well Integrity .
    -------------------------------------------

    We are designing a gas lift set up at one of our well. Gas will be injected through  gas lift valves into tubing/casing. current condition suggest that casing is pressurized. Multiple attempts were taken to bleed off casing pressure but it didn't 
    go below than 600 psig. samples were taken from tubing as well as casing annulus. Fluid analysis suggest there is communication between tubing & casing.

     

    From Well integrity stand point of view, what factors should be taken into account considering the above scenario.

    Kindly share opinions.

     
    ------------------------------
    Lajpat Rai
    Petroleum Engineer
    United Energy Pakistan Ltd
    Karachi City
    ------------------------------