This message has been cross posted to the following Discussions: Well Integrity and Completions .
-------------------------------------------
All,
We are planning to install SCSSV in one of our well. Expected Reservoir Pressure & temperature would be 6600 psi & 330 degF, respectively. CO2 mole% would be around 9. Based on that our plan is to complete the well with Hyper (modified)13% chrome tubing. What would be the suitable metallurgy for SCSSV? to avoid galvanic or bimetallic corrosion.
Kindly share your expert opinions for suitable metallurgy selection of SCSSV...
------------------------------
Lajpat Rai
Petroleum Engineer
United Energy Pakistan Ltd
Karachi City
------------------------------