Dan,
Thanks for your comments.
Currently the well is shut down and the company decided the temporary abandonment while is looking for 20,000 psi BOPE.
The drilling was shut down at 6300 m (850 m Open hole) with a mud density of 17.5 ppg because some admissions and became a well control issue.
Mud logging give C1 from C5, no H2S and 5% CO2 max were detected.
Max temp detected by MWD was 136°C @ 5470 m (18,000 ft)
We also start the design / procurement for 20,000 psi well head and well testing service.
Any tips and recommendations will be welcome in order to complement our existing procedures.
Best regards
Sergio
________________________________
"Cuidar la naturaleza es vivir mejor... hagámoslo juntos. Imprime sólo lo necesario."
"La información transmitida en este mensaje está destinada únicamente a la persona o entidad a la cual el mismo está dirigido, y puede contener material confidencial, reservado o sujeto al secreto profesional. Cualquier revisión, retransmisión, divulgación u otro uso de la misma, o la realización de cualquier acción basada en ella por personas o entidades distintas de la indicada, no está permitida. Si usted ha recibido este mensaje por error, tenga la amabilidad de destruirlo, sin copiarlo ni divulgar su contenido. Muchas gracias."
The information contained in this message is directed exclusively to the person or entity to whom the message is addressed, and it might contain information that is confidential, privileged or otherwise legally exempt from disclosure. Any action based on it, performed by an individual or entity different from the one it was intended, is not allowed and its contents should not be read, forwarded, disclosed, or used in any other way. If you have received it by mistake please delete it from your system, you should also not copy the message nor disclose its contents to anyone. Thank you.
------Original Message------
------------------------------
Henry Adom-malm
Managing Director
Horizine Tech. Int. Gh Ltd.
Accra
------------------------------