Dear All,
I am working on well abandonment offshore. I have a situation in which Twin Wells have been completed in 36" Conductor casing. Both the wells have 9-5/8" production casing inside 13-3/8" casing and all casings cemented to mudline (rather few meters above the mudline).
I would appreciate inputs on cutting two parallel and concentric strings of 13-3/8" and 9-5/8" casing strings along with 36" conductor casing.
Best Regards,
------------------------------
Shashank Shekher
Sr. Technical Advisor
Niko Resources Ltd
Baroda
------------------------------