    Dear All,

    I am working on well abandonment offshore. I have a situation in which Twin Wells have been completed in 36" Conductor casing. Both the wells have 9-5/8" production casing inside 13-3/8" casing and all casings cemented to mudline (rather few meters above the mudline).

    I would appreciate inputs on cutting two parallel and concentric strings of 13-3/8" and 9-5/8" casing strings along with 36" conductor casing. 

    Best Regards,
    ------------------------------
    Shashank Shekher
    Sr. Technical Advisor
    Niko Resources Ltd
    Baroda

    ------------------------------

     