Blog Viewer

Sand production as flow assurance issue in a welbore

  
Sand production is a significant flow assurance issue in a wellbore because it can lead to a variety of operational problems that can compromise well performance and integrity. Here is an overview of how sand production impacts flow assurance
1. Erosion and Equipment Damage
Tubing and Downhole Equipment: High-velocity sand particles can erode tubing, subsurface safety valves, and other downhole tools, reducing their lifespan.
Surface Facilities: Sand can also damage flowlines, chokes, and separators, leading to frequent maintenance and potential equipment failure.
2. Blockage and Reduced Flow
Perforation Blockage: Accumulation of sand in perforation tunnels can restrict hydrocarbon flow from the reservoir.
Plugging of Tubulars: Sand settling in the wellbore can cause partial or complete blockage of production tubing, reducing production rates.
Surface Line Blockages: Sand can accumulate in surface flowlines and processing facilities, requiring regular cleanout operations.
3. Wellbore Instability
Formation Collapse: Continuous sand production can cause the formation around the wellbore to become unstable, leading to wellbore collapse.
Casing Damage: Excessive formation movement can damage casing strings, leading to loss of well integrity.
4. Increased Operational Costs
Frequent Cleanouts: Sand accumulation may require regular wellbore cleanouts using coiled tubing or wireline.
Enhanced Monitoring: Sand detection and control systems must be installed and maintained, adding to operational costs.
Production Loss: Reduced flow rates due to sand plugging can significantly impact production economics.
5. HSE (Health, Safety, and Environment) Risks
Handling of Produced Sand: Surface handling of sand poses environmental risks and requires safe disposal methods.
Risk of Blowouts: Severe erosion of critical components like subsurface safety valves can lead to uncontrolled flow.
0 comments
3 views

Permalink

Tag