Simple Registration

When:  Thu, Oct 22, 2026 from 11:30 AM to 01:00 PM (CT)
Where:   Petroleum Club of Fort Worth, 777 Main St., Fort Worth, TX, 76102, US
Community:   Fort Worth Section

When & Where



Petroleum Club of Fort Worth
777 Main St.
Fort Worth, TX 76102
US

Thu, Oct 22, 11:30 AM - 01:00 PM (CT)


Description

Our fall speaker series continues with Mike Poythress, retired Principal Production Engineer from ConocoPhillips and an SPE Distinguished Lecturer, at our October 2026 luncheon. This talk is a higher level, deep dive into sucker rod pumping fundamentals, focused on why most SRP wells underperform their design rates and what operators can do about it in both horizontal and vertical wells.

Biography

Mike Poythress is a retired Principal Production Engineer from ConocoPhillips, where he provided technical support to the Global Engineering and Operations teams in the sucker rod pumping arena, covering design, optimization, troubleshooting, failure analysis, and training with a focus on sucker rods, pumps, and SCADA systems. Over 11 years at ConocoPhillips, Mike received 6 awards in the annual Top Instructor program. He is the recipient of the SWPSC's 2025 J.C. Slonneger award and served as the 2024 Permian Basin AL Conference Chairman. Prior to joining ConocoPhillips, Mike worked 35 years for four companies that make pumps and sucker rods.

Abstract

When many horizontal wells are converted from ESP or gas lift to sucker rod pump (SRP), there is an expected and unfavorable step change in production, along with a predictable season of repeat downhole failures.

Most SRP wells struggle to produce the rates calculated with the current design programs. As pump intake pressure decreases, gas interference becomes a greater issue in the pump. This situation decreases daily run times as the controller identifies these low fillage events and puts the well into a temporary idle time, completing a run/stop cycle. Many operators increase idle times to reduce the number of cycles each day, expecting that a higher number of cycles will lead to more failures. This results in wells with high fluid levels on the backside, running less than 24 hours per day.

This situation also happens with vertical wells when the fear of failure, and the perceived lack of time to optimize a well, becomes the standard. When horizontal wells slug, gas interference becomes an even larger issue. Wells can experience hours of what appears to be no fluid at the pump, which limits run times and production.

The author believes it is imperative that operators and suppliers partner together to develop technology that will accurately identify failure risks when operating under the volatile slugging conditions that horizontal wells present in a rod pump application, all while identifying optimum operating practices during ever-changing conditions to maximize production in both horizontal and vertical wells.

Pricing

registration type
early
regular
    Member
$35.00
$40.00

    Non-member/Guest
$40.00
$45.00

Contact Information